Main Construction Forecast of Base Settlement Progress Based on In-Situ Data

Forecast of Base Settlement Progress Based on In-Situ Data

The basic methodology to check the correctness of a geotechnical solution adopted is the monitoring of a geotechnical situation, in particular, geodetic observations of settlement progress in buildings and structures, their analysis and forecasting of further behavior.
 
Therefore, it is of outmost interest to develop a method of long-term settlement forecast for buildings located in the system of geotechnical barriers. The basic data for this forecast are short-term observations of settlement progress at the construction or early operation stages.
The results of such a forecast are used to evaluate the correctness of a solution adopted or the need for additional measures to improve deformation behavior of the building.

Full content of this issue you can read here

The full version of the article can be read in our printed issue, also you can subscribe to the web-version of the magazine

strelka Text: V.I. TRAVUSH, O.A. MAKOVETSKY
Materials provided by: GORPROJECT, CJSC; Perm National Research Polytechnic University