Polish Flagship
The construction of a new flagship development - Varso by international real estate developer HB Reavis, comprising three buildings including an office tower designed by Foster + Partners has started in Poland. It presents a unique new hotspot for businesses, residents and tourists in the heart of Warsaw city center.
Its location offers excellent transport links as it is sited alongside the metro and commuter railway stations and is close to 30 bus and tram lines.
The development located next to Warsaw’s Central Railway Station will revive the most centrally located brownfield area in the capital city by bringing new life to the vicinity and improving the local environment and surrounding public spaces with extensive new planting and street furniture.
Varso Tower, at 53 stories (310 meters) will be the tallest building in Poland offering generous, flexible modern office spaces. It will also feature an observation deck, which at 230 meters will make it one of the highest in Europe. From here building users, locals and tourists alike will be able to enjoy unique and spectacular views of Warsaw’s skyline and the metropolitan area. There will be also being a restaurant on levels 46 and 47 for visitors. A wide range of facilities and services including shops, restaurants and cafés will occupy the buildings’ ground levels. In addition, vibrant covered internal streets will be open to all throughout the year.
Varso’s lower buildings by Hermanowicz Rewski Architects will form a new, central frontage along one of the main streets next to the central station. The two office buildings will “cascade” from a joint multi-storey podium with a stone clad elevation and will feature green roof-top terraces open daily for the building occupants.
State-of-the-art technologies will be introduced to reduce electricity and water consumption as well as air pollution. Varso will be the first project of this scale in Poland to be rated “Outstanding” against the BREEAM certification scheme.
The construction of the skyscraper has already commenced with completion scheduled for 2020.